第1題
The engineer is not happy with the project, and ______ is her boss.
A.neither
B.so
C.either
D.a(chǎn)s
第2題
The engineer is not happy with the project, and ______ is her boss.
A.neither
B.so
C.either
D.a(chǎn)s
第3題
The engineer is not happy with the project, and __ is her boss.
A. neither B. so C. either D. as
第4題
The engineer is not happy with the project, and __ is her boss.
A. neither B. so C. either D. as
第5題
The engineer is not happy with the project, and_____is her boss.
A. neither B. so C. either D. as
第6題
181 A project manager who, in a deference of opinion with the project controls engineer on how costs are to be reported, dictates the format of the cost report may be said to have a conflict management style. A. Withdrawing
B. Forcing
C. Confrontational
D. Authoritarian
E. Combative
第7題
99 A project manager who, in a deference of opinion with the project controls engineer on how costs are to be reported, dictates the format of the cost report may be said to have a conflict management style. A. Withdrawing
B. Forcing
C. Confrontational
D. Authoritarian
E. Combative
第8題
A.Logistic Engineer
B.Logistics Engineering
C.Logistics Project
D.Logistics Planning
第9題
The quality objectives are approved in the conceptual stage of the project by the:
A . Project Engineer
B . Project Manager
C . Functional Manager
D . Quality Assurance Manager
E . Project Owner